Replanning dock appointments after inbound linehaul runs late
A dock scheduler shows free times. It rarely knows whether the inbound trailer is blocked at a previous site, whether the receiving crew has the right equipment, or whether a driver can safely make a proposed slot.
- Source recordsGate and carrier events
- ProcessingCheck dock constraints
- Decision ownerTransport planner
- Operational outputAccepted revised slot
Implementation approach
Bring gate arrivals, carrier ETA updates, unload requirements and receiver cut-offs into a shared planning view. Treat a proposed change, carrier acceptance and receiver confirmation as separate events.
Exceptions and operating controls
A transport planner owns replanning; the carrier retains the safety decision. Do not auto-compress a journey to protect a booking. Escalate shipments whose next feasible slot misses a customer constraint.
Illustrative operating scenario
Two late vehicles need the same unloading attachment. The planner sees that a free door does not make either load serviceable and secures the equipment and receiver before confirming the new order.
Acceptance test and handover
Replay a congested shift with gate and unloading timestamps. Assess detention by cause, unacknowledged slot changes and bookings that were physically impossible to service.
Industry evidence
The NHVR describes how the way booking slots are managed can affect transport safety across the supply chain. NHVR on time-slot booking risks